Other Site Considerations We have a template for the most environmentally advanced warehouses in the world. Called Eco-Template it means our buildings provide superior performance on energy efficiency, work environment, carbon reduction, renewable energy and water usage. It’s Gazeley’s policy, for example, to recycle rainwater from the roofs of the buildings for cleaning and flushing toilets.

Gazeley seeks to include a wide range of environmental measures in its developments, including those that generate power from renewable sources. These can include ground source heat pumps, kinetic plates, bio-fuel micro power plants, solar heating and photovoltaic panels. On some previous developments, including those at Bedford and Sheffield, Gazeley has
included a wind turbine following the grant of an appropriate planning permission.

However, not all local communities favour the installation of wind turbines and Gazeley would respect such views at Peterborough if there was no strong local support for the generation of electricity from wind power on this site. A further consideration to take into account is the close proximity of important bird habitats that are likely to point against the inclusion of a wind turbine at Magna Park Peterborough.

To date Gazeley has never hosted a mobile phone mast on any of its developments and has no plans to do so at Magna Park Peterborough. In any case such a proposal would need to be the subject of a separate planning approval. Effects on TV reception from our developments are rare in
Gazeley’s experience but we will carry out a survey of TV reception before planning permission is granted and will accept the imposition of a planning condition requiring us to rectify any TV reception problems if these do occur following the carrying our of development.
Contact Gazeley:
telephone:0207 901 4455